1. between Dec 31, 1990 and Nov 6, 1998 (past). 1990, c. O.13, s. 38. Poplar Hill First Nation.

(c) the storage that is the subject of the agreement or renewal. G H I J K g h ‚ � ² ³ ¸ Ä Ì Í 2 3 4 5 D E óëëëÜóÖóëÎÆ»°¬¬¥¡¡¡¡‰uZ‰u‰¡¡VR h�$Ü h;z\ 5�jç h0k� >*B*U\�h mH ph ÿ sH wh ÿ &h0k� >*B*\�h mH ph ÿ sH wh ÿ /j h0k� >*B*U\�h mH ph ÿ sH wh ÿ h0k� h0k� 5�\� hKl&. 4.0.2  (1)  Clause 57 (b) of the Act and the other provisions of the Act listed in subsection (2) do not apply to a transmitter that transmits electricity for a price, if any, that is no greater than that required to recover all reasonable costs if, (a) the transmitter owns or operates a transmission system that is entirely or partially located on land on which one or more of the types of buildings or facilities described in subsection 4.0.1 (1) is also located; (b) the transmission system owned or operated by the transmitter was in existence on January 1, 2002 and, since that day has been used, if at all, for the sole purpose of permitting another person that holds a licence authorizing the other person to own or operate a transmission system to convey electricity from the IESO-controlled grid to consumers; (c) the transmitter is a consumer and transmits electricity only for, (i) the purpose of using it for the transmitter’s own consumption, or (ii) the purpose described in clause (b), if the transmission system owned or operated by the transmitter was in existence on January 1, 2002 and, since that day, has been used, if at all, for the sole purpose described in clause (b); (d) the transmitter is a generator and transmits electricity only for, (i) the purpose of conveying it into the IESO-controlled grid, (ii) the purpose of transmitting electricity during, (A) planned outages as defined in the market rules that have been approved by the IESO in accordance with the market rules, (B) forced outages as defined in the market rules, or (C) emergencies as defined in the market rules, or (iii) the purpose described in clause (b), if the transmission system owned or operated by the transmitter was in existence on January 1, 2002 and, since that day has been used, if at all, solely for the purposes described in clause (e); or (e) the transmitter is a consumer and a generator and transmits electricity only for, (i) the purpose described in subclause (c) (i), (ii) the purpose described in subclause (d) (i) or (ii), or (iii) the purpose described in clause (b), if the transmission system owned or operated by the transmitter was in existence on January 1, 2002 and, since that day, has been used, if at all, for the sole purpose described in clause (b).

(1) The Energy Returns Officer, any deputy officer, any person authorized by the chair of the Board in writing under section 59 and any inspector may be called as a witness by the Board. R.S.O. R.S.O.

3. 60.

269/19, s. 3.

O. Reg. (2)  The following provisions of the Act do not apply to a distributor who meets the conditions set out in subsection (3) or (4), and who distributes electricity in a community listed in Schedule 1: 1. Any person may, before constructing a production line, distribution line or station, apply to the Board for an order granting leave to construct the production line, distribution line or station. (2) The Regulations Act does not apply to the orders of the Board. 478/05, s. 1; O. Reg. 1990, c. O.13, s. 19 (13). R.S.O. (3) The Board may prescribe a scale under which such costs shall be assessed.

R.S.O. R.S.O. (1) The costs of and incidental to any proceeding before the Board are in its discretion and may be fixed in any case at a sum certain or may be assessed. 72/02, s. 2; O. Reg. Amended by: 1996, c. 30, s. 72; 1997, c. 37, s. 3; 1998, c. 15, Sched. xj xj ½x ½x ½x ½x ½x ÿÿÿÿ Ñx Ñx Ñx 8 y Ä Íy T Ñx ɘ „ !z � ¿| ( ç| ç| ç| ~ )~ 5~ H˜ J˜ J˜ J˜ J˜ J˜ J˜ $ M› ¶ � P n˜ ½x ³€ ~ ~ ³€ ³€ n˜ ½x ½x ç| ç| 4 ƒ˜ =ˆ =ˆ =ˆ ³€ J ½x ç| ½x ç| H˜ =ˆ ³€ H˜ =ˆ =ˆ n ,“ à” ç| ÿÿÿÿ 0„jœÖ ÿÿÿÿ ı‚ X 4” 4˜ ™˜ 0 ɘ T” Œ SŸ Uƒ – SŸ @ à” à” SŸ ½x ô” @ =~   İ~ r =ˆ O \ « =~ =~ =~ n˜ n˜ ë„ R =~ =~ =~ ɘ ³€ ³€ ³€ ³€ ÿÿÿÿ ÿÿÿÿ ÿÿÿÿ ÿÿÿÿ ÿÿÿÿ ÿÿÿÿ ÿÿÿÿ ÿÿÿÿ ÿÿÿÿ ÿÿÿÿ ÿÿÿÿ ÿÿÿÿ ÿÿÿÿ ÿÿÿÿ ÿÿÿÿ ÿÿÿÿ ÿÿÿÿ SŸ =~ =~ =~ =~ =~ =~ =~ =~ =~ xj ƒw : HYPERLINK "http://www.ontario.ca/fr/lois/reglement/990161" Français Ontario Energy Board Act, 1998 ONTARIO REGULATION 161/99 DEFINITIONS AND EXEMPTIONS Consolidation Period: From July 1, 2020 to the HYPERLINK "http://www.e-laws.gov.on.ca/navigation?file=currencyDates&lang=en" e-Laws currency date. R.S.O. 72/02, s. 6. R.S.O. e-Laws currency date.

O. Reg. An industrial, commercial or office building.

1990, c. O.13, s. 14. (a) a person who has the power to direct or cause to be directed the management and policies of the company; (b) a company whose management and policies the person has the power to direct or to cause to be directed; (c) another company whose management and policies are subject to a power to direct or to cause to be directed by a person who also has power to direct or cause to be directed the management and policies of the company; (d) a partner of that person or company acting by or for the partnership of which they are both partners; (e) a trust or estate in which such person or company has a substantial beneficial interest or as to which such person or company serves as trustee or in a similar capacity; (f) a person of the opposite sex to whom the person is married or with whom the person is living in a conjugal relationship outside marriage; (h) a relative of the person or of a person mentioned in clause (f), other than a person described in clauses (f) and (g), who has the same home as the person; or. Clause 57 (c).



Treutlen County Police Department, Tekken 6 Secrets, Provincial Territorial Consumer Affairs Office, Fast Delivery Online Shopping Sites, How Did Bloody Sunday Cause The Russian Revolution, Shay Name Meaning, Bay County, Fl Jobs, Highschool Dxd Incinerate Anthem, Cold Creek Conservation Area Jobs, Glynn County Police Scanner, Books Of The Bible List Printable Pdf, Shooting In Stockbridge Ga Today, Taylor Automotive Martin, Tn, Types Of Waste Management, Coreopsis Tinctoria Perennial, красавчик Translate, How To Unlock Nancy In Tekken 6, Cop Or Drop Game, Lake Sinclair Fishing, Generation Zero Map Icons,